Watching paint dry is like waiting for water to boil.
The first coat of paint has been applied to some of the walls.
All the wood work has been covered.
Even those little benches in the mud room are covered.
All of the ceilings have been painted.
The beam has been covered to protect it.
The mess is still there.
The closets have been completed.
It's Drifting Dune!
The second coat should be on today!
Hoping we DRIFT through the day, rushing home to watch it dry!
No comments:
Post a Comment